Planning specialist capacity for pharmaceutical technology transfer

For an Irish pharmaceutical site receiving a product or process from another location, the workforce question extends beyond the transfer team’s headcount. Which specialists must work together at each interface, and will they have enough time to resolve the decisions that connect the sending and receiving sites?
This is a capacity discussion within established quality and programme governance. The aim is to make specialist availability match the transfer plan, while recognising the other commitments those professionals carry.
Plan capacity around the interfaces
The World Health Organization’s technology-transfer guidance addresses qualified personnel, defined responsibilities and communication between sending and receiving units. It also covers personnel capability in gap analysis and the resource implications of project changes. These are technical guiding principles; they do not prescribe a commercial workforce engagement model.
Our practical recommendation is to translate the agreed transfer plan into a view of the interfaces that need specialist input. For example, identify where process knowledge must inform manufacturing preparation, where analytical questions need input from both laboratories, and where technical work needs quality review before the next activity proceeds.
For each interface, record the output, the participating disciplines and the decision owner. Then identify the preparation and review time required on each side. A named specialist on an organisation chart is not, by itself, a confirmed allocation of capacity.
Make shared specialist commitments visible
Consider a hypothetical receiving site preparing for two transfers while its analytical specialists also support an existing product portfolio. Both transfer schedules assume access to the same subject-matter expert during a critical review window.
Adding execution capacity may help with defined analytical work, but the shared expert’s review commitment remains a separate planning question. The programme owners need to agree which activity takes priority, what can move and whether another suitably experienced specialist can undertake a defined part of the work.
Review those commitments across programmes rather than within each project alone. Include sending-site availability, receiving-site reviewers and any specialist partner contribution. Show unresolved allocations explicitly so the programme can address them before treating the milestone as fully resourced.
Separate knowledge gaps from delivery peaks
A request for “technology-transfer support” can conceal different needs. One workstream may require product-specific process understanding. Another may need additional execution capacity within an established approach. A third may need experienced coordination across manufacturing, quality control, engineering and quality assurance.
Describe each requirement through the work to be done, the relevant experience and the interfaces the specialist must manage. Where knowledge sits with the sending team, plan access to that expertise; do not assume a new external specialist can replace it immediately.
For employers in Ireland, the brief should also state which activities require presence at the receiving site and which can be undertaken through agreed remote collaboration. Match the arrangement to the work and the organisation’s existing controls.
Allocate capability by phase
A useful workforce proposal should explain how specialist involvement changes as the transfer progresses. Earlier work may require concentrated input into technical assessment and planning. Execution may call for a different balance of process, analytical, engineering and validation capacity. Review and close-out require their own allocation.
Use the site’s agreed milestones to define those commitments. Specify the trigger for increasing or reducing support, the information needed to make that decision and the person authorised to agree it. Revisit the allocation when scope or timing changes, including the effect on other programmes sharing the same expertise.
Where a specialist spans several phases, identify the knowledge or responsibility that justifies continuity. Where a contribution is bounded, define its output and completion criteria. This gives commercial discussions a clearer basis than extending every engagement to the programme end date.
Choose the engagement around the work
Berkley’s Workforce Solutions include Professional Service Engagements, Contingent Workforce Solutions and Specialist Placements. Consider sustained team capability, additional contractor expertise and individual professional roles against the actual requirement, scope and accountability. Discuss the proposed arrangement rather than assuming the model name determines who owns the transfer.
Berkley’s Life Science practice includes process, manufacturing and technology-transfer expertise alongside quality, validation and project delivery. Bring the next transfer milestones, sending and receiving interfaces, and unresolved specialist allocations to the workforce discussion.
Speak to Berkley about specialist capability for your pharmaceutical programme.
Related reading: choosing a workforce engagement model.
Reference: WHO guidelines on technology transfer in pharmaceutical manufacturing, TRS 1044, Annex 4 (2022), sections 1.6, 4.3–4.4, 5.3, 5.6–5.7, 5.15 and 12. Checked 9 October 2026.